This was totally unexpected! I had thought the site would be close off for Christmas - New Year holidays and they would only resume work mid or late Jan 2011.
However I dropped by around sunset and found out gyprocks had been delivered and piled up in the garage.
Actually putting them up should not take very long so as long as it has been scheduled to work on this week, there is in fact a chance it can be done within next one day or two! A visit later this week will tell!
Monday, December 20, 2010
I've got another neighbour!
Got a mail from council advising that my another next door has also submitted their application for their house. So my next door will not be an empty block for too long! Good News!
What's more interesting was that they are building a Concerto with Raza facade with Allworth.
My final two short listings when I was selecting my build were Galleria 210 from Jennings or Concerto from Allworth. I finally chose Galleria 210 and now my next door is going to build a Concerto!
What's more interesting was that they are building a Concerto with Raza facade with Allworth.
My final two short listings when I was selecting my build were Galleria 210 from Jennings or Concerto from Allworth. I finally chose Galleria 210 and now my next door is going to build a Concerto!
Sunday, December 19, 2010
Week 47 - We've got insulation, AKA pink bags
I didn't expect to see there progress prior today's visit as I thought many tradies would have been in the industry standard 5-week Christmas shutdown. However I did see the insulation is being put on but not quite completed yet. Not sure if they will finish it next week.
Even so these are what were done in the past 4 weeks:
Even so these are what were done in the past 4 weeks:
- Week 44: nothing
- Week 45: bricks cleaned
- Week 46: air conditioning ducts and electrical
- Week 47: insulation partially done
Saturday, December 11, 2010
Aircon pipes and electrical wires
Apparently air conditioning pipes and electrical wires are being installed.
I assume they will also need to do insulation before putting gyprocks.

The electrical wires. The blue one is the Ethernet cable connecting study room and lounge. The black one is the TV antenna and the white ones are power wires.
Thursday, December 9, 2010
New Satellite Imagine - 17 October
Week 46 - Looks like a waiting game again!
The site fence has been left open like that for the past three days. I texted my SS after I swung by building site last night. He replied 6-ish o'clock this morning and said he would check it out.
He also said we are waiting for A/C and alarm to be installed and to finish the relative electrical wirings. After that we can do the gyprocks. Assuming the 5-week shutdown is for the last week in December and whole month in January, we still have two weeks to go for the rest of this year so there is still a chance that gyprocks will be done by then! Let's see!
This would mean in the last three weeks (from Week 44 to Week 46) there would have been only one-day worth of works done - that was cleaning the bricks on Monday last week! A bit disappointing but not out of norm anyway!
He also said we are waiting for A/C and alarm to be installed and to finish the relative electrical wirings. After that we can do the gyprocks. Assuming the 5-week shutdown is for the last week in December and whole month in January, we still have two weeks to go for the rest of this year so there is still a chance that gyprocks will be done by then! Let's see!
This would mean in the last three weeks (from Week 44 to Week 46) there would have been only one-day worth of works done - that was cleaning the bricks on Monday last week! A bit disappointing but not out of norm anyway!